On the Critical Path
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
 Genre: Documentaire
Jeter:
Équipage: Dennis Sawyer (Producer), Kenneth McCready (Script), Bernard Bordeleau (Sound Editor)
 Mot-clé:
On the Critical Path 1971
nuclear power
candu
ONF | NFB
On the Critical Path streaming
On the Critical Path gratuit
On the Critical Path film complet
On the Critical Path voirfilm
On the Critical Path vkstreaming
Commentaire
Nous ne partagerons jamais votre e-mail avec quiconque.
 
  
  
  
  
  
  
  
  
  
  
 